Skip to main content
Services / Automation & Control
Automation & Control Mackay

Control System Audits - Queensland
Know the real state of your control system.

Beetle Engineering carries out focused audits of PLC, SCADA and HMI systems for industrial operations across Central Queensland. We assess the condition, documentation and performance of your control systems and give you a clear, prioritised picture of what needs attention.

HERO IMAGE
control panel close-up

What control system audits with Beetle actually looks like.

Why audit the control system separately

Electrical infrastructure and control systems age differently and fail differently. A switchboard can look fine for decades with routine maintenance, while a PLC program can accumulate undocumented patches, a SCADA alarm system can quietly become unmanageable, and firmware can fall years behind vendor support - all without an obvious outward sign of trouble.

A control system audit is a focused, technical look at the systems that actually run your process - not a general walk-through, but a structured assessment of hardware, software, documentation and performance against what a well-maintained system should look like.

What we assess

PLC hardware and firmware - processor and I/O module condition, firmware version against current vendor releases, battery and backup status, and spare parts availability.

Program structure and documentation - logic organisation, commenting standards, use of hardcoded values versus parameters, and whether the running program matches the documented version. Undocumented changes made during past breakdowns are a common finding.

HMI and SCADA application health - screen navigation and usability, tag database organisation, historian configuration, and alarm management. Alarm rationalisation is often overdue - systems accumulate nuisance alarms over years of operation until operators start ignoring the alarm system altogether.

Control network communications - PLC-to-PLC, PLC-to-SCADA and field device communications. Identification of unreliable links, protocol mismatches, and single points of failure in the communication path.

Change and version control - how program changes are managed, backed up, and tracked. Sites without a clear change control process are the ones most likely to be running an undocumented, drifted version of their control logic.

How findings are reported

Findings are organised by system and prioritised by risk - what is likely to cause a problem, and what the consequence would be if it does. We separate issues that need immediate attention from items that can be planned into the next shutdown or budget cycle.

Where the audit identifies hardware approaching end of vendor support, we can scope a dedicated control systems obsolescence audit to build a replacement roadmap and budget case.

One process. Zero surprises.

Scoping
  • Site walk & asset review
  • Requirements capture
  • Network & OT audit (if required)
Quoting
  • Scope of work definition
  • Deliverables schedule
  • Fixed-price or T&M proposal
Optional
Upfront engineering
  • Concept design & review
  • Feasibility & risk assessment
  • Design basis document
Documentation
  • Functional descriptions
  • Electrical drawings & diagrams
  • Network & architecture diagrams
  • IO lists
  • ITC / test sheets
  • Asset & network audits
Programming
  • PLC programs (Studio 5000 / RSLogix)
  • SCADA & HMI development
  • FactoryTalk / CitechSCADA / Aveva
  • OT network configuration
FAT → SAT & commissioning
  • Factory acceptance testing (FAT)
  • Site acceptance testing (SAT)
  • Loop checks & punch-list close-out
  • Hand-back & as-built documentation
All industries →

Common questions, straight answers.

A site audit covers the full scope of electrical and control infrastructure - switchgear, earthing, protection systems and control systems together. A control system audit is narrower and more detailed - it focuses specifically on PLC, SCADA and HMI hardware, programs, documentation and performance. It suits clients who already understand their electrical condition and want a deeper technical review of the control system itself.
PLC hardware condition and firmware currency, program structure and documentation quality, HMI and SCADA application health, alarm management performance, and network communications between control system components. We also note where logic has been patched or modified without being documented, which is a common source of maintenance difficulty.
Access to the running programs is ideal, either on-site or via a backup. If source programs are not available, we can still assess hardware condition, documentation state and system performance, and will note where a lack of source access limits what can be assessed.
A written report covering findings by system, a risk-based prioritisation of issues, and practical recommendations. Where findings point to end-of-life hardware or vendor support risk, we can scope that separately as part of a control systems obsolescence audit.

Pairs well with

Ready to discuss your control system audits project?

Talk to an RPEQ engineer about your project. We work across mining, sugar, manufacturing and utilities throughout Queensland.